
Thermal Power Plants
Buyer-selected biomass for approved co-firing programmes
Thermal-power facilities may procure biomass products under approved programmes, subject to buyer specifications, procurement conditions, and applicable technical and regulatory requirements.
Understanding the requirement
Power-sector requirements can be highly specific. The product and specification selected by the buyer must match its current tender or contract, including any requirements for composition, dimensions, durability, fines, moisture, ash, handling, and documentation.
The safe co-firing ratio and required plant changes depend on boiler design, milling and conveying systems, combustion behaviour, safety controls, emissions limits, and the approved operating procedure. These decisions remain with the generating company and its engineering and compliance teams.
Choose from the complete product range
We do not assign or recommend products by industry. Every AEPL product is available for buyer consideration, and the buyer decides what to enquire about or order.
Review briquettes, pellets, and wood chips with indicative specifications in one catalogue.
The buyer remains responsible for confirming the selected product’s equipment compatibility, process-quality impact, safety, emissions controls, permissions, storage, handling, and operating requirements.
What the facility should confirm
Equipment Compatibility
Fuel form, size, feeding, combustion, and operating envelope.
Fuel Specification
Available lot GCV, moisture, ash, dimensions, fines, and contaminants.
Process & Quality
Effects on heat control, output quality, cleaning, and maintenance.
Safety & Storage
Fire protection, housekeeping, moisture protection, and handling.
Emissions & Permissions
Consent conditions, permitted fuels, controls, monitoring, and records.
Delivered Economics
Useful heat, transport, unloading, storage, ash handling, and reliability.
From requirement to coordinated delivery
- 01
Share Requirement
Application, fuel, quantity, destination, and schedule.
- 02
Assess Feasibility
Source, specification, availability, route, and commercial viability.
- 03
Align Terms
Available specification, price, documentation, and delivery basis.
- 04
Coordinate Dispatch
Loading, vehicle, applicable documents, and delivery communication.
Frequently Asked Questions
What co-firing ratio is typical when blending biomass into a coal boiler?
This depends entirely on your specific boiler design, fuel handling system, and emission targets — co-firing ratios vary widely across plants. We recommend a technical trial with your boiler engineering team to determine what percentage your specific setup can handle before committing to a supply volume.
Who selects the biomass product for a thermal-power facility?
The buyer selects the product according to its tender, contract, approved plant systems, testing requirements, and applicable policy. AEPL does not assign a product by industry.
Discuss your Thermal Power Plants application
Share the equipment, current fuel, quantity, destination, and expected schedule.